Since 1991 · Solid wood · Turnkey · Delivery across DE / AT / CH
Since 1991 3-year warranty GEG & structural certs included Turnkey to DE / AT / CH Solid wood
In 6 steps

How your house is built

From the first enquiry to turnkey handover – a clear process with a fixed schedule and no surprises.

1

Enquiry

You send us your wishes – model, region and use. We usually reply within one business day.

2

Consultation & planning

Together we define the layout, fittings and schedule. You receive a transparent fixed-price quote.

3

Contract & deposit

After contract and deposit we secure your production slot and start building.

4

Production

Your house is built in about 90 days in our workshop in Plovdiv – incl. GEG certificate and structural engineering.

5

Delivery to your address

Transport by low-loader right to your address – across the entire DACH region.

6

Turnkey handover

We hand over your move-in-ready house. Kitchen, bathroom, electrics and interior are complete.

Always included

What we take care of for you

GEG & structural engineering

All certificates for the DACH region are part of the offer.

Transport & delivery

By low-loader – we deliver right to your door.

Fixed scheduling

Usually around 90 days from order to handover.

Good to know before you start

How long does it take overall?

From your first enquiry to a quote usually takes only a few days. Production takes around 90 days, followed by delivery to your address. Allow extra time for the plot, foundation and – if required – the building permit.

When do I pay what?

With the contract you pay a deposit that secures your production slot. The balance and exact payment dates are set out transparently in the contract.

Can I customise my house?

Yes. Layout, kitchen, bathroom, façade, colours and fittings can be adapted to your wishes during planning. All changes are included in your fixed-price quote so there are no surprises later.

What do I need for the permit?

We supply the GEG certificate and structural calculations with every house. Which further documents your municipality requires depends on the location – our building-permit guide gives an overview.

Ready for step 1?

Send us your enquiry – free and with no obligation. We’ll plan the rest together.